Laying of new HDPE pipes with the directed
non-excavation pipe laying method (Forage Dirige directed method)
Non-excavated method branch road construction (fuse and passing through method: ENCLATEMENT)
Rehabilitation – Channel Cleaning and Monitoring
Monitoring of channels by means of the monitoring device equipped with a cam, failure determination
and finding the applicable failure method, preparing this data on CD or documentation.
High pressure and suction (the combined vehicle with recycle feature)
for channel cleaning in motor vehicles
Considering the technical reports issued for failure determination and carrying out of
the repair, cost, environment, traffic, timescale and urgency criteria shall be taken into account and partial
or complete repair by the robot mounted rehabilitation equipment between two stacks (There is no excavation
through this process)