|
|
 |
|
 |
Housing construction for Turkish
Housing Bank |
| |
 |
Adiyaman Municipality Koru-Palani
drinking water transmission line
construction
|
| |
 |
Adiyaman Municipality Office
Complex construction |
| |
 |
Ankara Metropolitan
Municipality Kibris Street foot
pavement construction |
| |
 |
Ankara Metropolitan
Municipality Sincan Railroad and
under-crossing construction |
| |
 |
Ankara Metropolitan
Municipality Akcay Facilities
Transformer Construction
|
| |
 |
Within the ISKI Head Office
Gaziosmanpasa Branch Office
liability zone (Gaziosmanpasa
and Eyup Districts) new sewer
construction, repair, stack
elevation, stack cleaning,
clogged connections and channel
opening works |
| |
 |
Within the ISKI Head Office
Kartal Branch liability zone
(Kartal and Maltepe Districts)
water and channel construction
and maintenance works |
| |
 |
Istanbul Metropolitan
Municipality ISTON Inc.
Anatolian Side landscaping and
foot pavement construction |
| |
 |
Roadways General Directorate
17th Region Office, Duzce (Gumusova)
– Istanbul – Edirne (Kapikule)
highway and connection roads
construction items cleaning,
channel monitoring, cleaning and
rehabilitation, pipe replacement
without excavation. |
|
| |
 |
Within the ISKI General
Directorate Umraniye Branch
liability zone (Umraniye,
Sultanbeyli, Samandira, Sarigazi,
Cekmekoy, Sile municipal
boundaries) drinking water and
waste water construction,
maintenance and rehabilitation
works |
| |
 |
Within the ISKI General
Directorate Buyukcekmece Branch
Office liability zone, drinking
water and waste water
construction, maintenance and
rehabilitation works |
| |
 |
Within the Anatolian Side 1st
Section various waste water and
rain water channel construction
project, Uskudar central and
central quarters waste water and
rain water separation works are
carried out |
| |
|
 |
Diyarbakir Water
and Sewer Office drinking water
equipment supply, as a German
Investment Bank KWF project |
| |
|
|
|
|